A burn or pungent odor of oil indicates - ✔✔excessive temperature
A Chain should be replaced when its length becomes ______longer than the original length. -
✔✔3 percent
A co
...
MSSC Maintenance Awareness Practice
Test
A burn or pungent odor of oil indicates - ✔✔excessive temperature
A Chain should be replaced when its length becomes ______longer than the original length. -
✔✔3 percent
A common sign of a misaligned coupling is _____________. - ✔✔excessive vibration
A multimeter is a multipurpose devise that can measure - ✔✔voltage, current, and resistance
A power diagram is used in addition to a ladder diagram to determine_________. - ✔✔All of
these (How the input functions on the machine, The sequence of operations, How the output
functions on the machine)
A power tool has the ground prong broken off of the plug on the power cord. What should be
done? - ✔✔Remove the power tool from service
A shaft coupling may be out of round if dial indicator shows _____________. - ✔✔any
movement
A sight glass in a reservoir usually indicates the ______ of fluid. - ✔✔level
A tool should be sharpened - ✔✔When an unacceptable surface finish is present
A viscos meter is a device used for measuring the viscosity of an oil and is generally _______
accurate. - ✔✔95%-99%
A well designed workstation places tools and equipment where they can be - ✔✔available with
minimum stress
A workstation should be designed to minimize motions that can - ✔✔cause repetitive/ stress
injuries
All documentation of preventive maintenance should be kept - ✔✔in a designated, safe and
secure location
An electrical diagram that arranges wires of a circuit into order rows is called a(n)
_____________. - ✔✔ladder diagram
An employee come to work on a rainy day and finds water dripping on tools in their workstation.
What should the employee do first? - ✔✔report the situation to the supervisor
Because dial indicators are fairly delicate, they should _________ during adjustment of the
motor position. - ✔✔be removed
Before adjusting motor position during a shaft alignment always make sure to remove the
_____________. - ✔✔dial indicator
Both analog and digital voltmeters measure - ✔✔Potential difference
Circuit testers determine if ______ electricity is present. - ✔✔AC
Daily maintenance involves daily records because - ✔✔Recurring events can be analyzed to
troubleshoot problems Records indicate how long a machine will run without lubrication
Devises called ____________ often serve as the brains of the automated machine. - ✔✔relays
Documentation that should be kept regarding a specific piece of equipment includes -
✔✔maintenance log
Feeler gauge, rulers, height gauges and dial indicators are commonly used for which task? -
✔✔alignment of industrial machines
For purposes of an oil analysis, one important category of information will be the - ✔✔Oil
viscosity
Gas cylinders need to be chained securely to keep them - ✔✔from falling or tipping over
Heavy axial loads are better handled by ________? - ✔✔angular contact bearings
High temperature can _____________ of a bearing. - ✔✔limit life
Housekeeping inspections and audits should include - ✔✔Unbiased auditors or inspectors
How is a cam likely to be mounted on a shaft? - ✔✔welded
How many extension cords are permitted to run across the floor of a workstation? - ✔✔0
If a company does follow-up work after a PM that is considered ________maintenance. -
✔✔reactive
If a machine is expected to have downtime for several shifts, the appropriate communication
between shifts for Lockout/Tagout procedures is - ✔✔verify energy state on machine, then
change locks
If a motor starts blowing fuses or tripping thermals, the most likely cause is - ✔✔An overload
motor
If a technician has unwired a motor from a disconnect and the circuit breaker still trips, the next
logical step is to ______ and see if the breaker trips again. - ✔✔replace the circuit breaker
If suspended metal products were found in oil analysis, it would indicate - ✔✔Bearing problems
In a PM audit, the _____ would likely be negatively impacted if there were a large number of
uncompleted PM work orders. - ✔✔critical path
It is important to have a/an ____________ to complete the PM work on a machine -
✔✔completion date
Leveling all machine components prior t
[Show More]