Environmental Science  >  QUESTIONS & ANSWERS  >  EPA 608 Type 3 Questions and Answers Already Passed (All)

EPA 608 Type 3 Questions and Answers Already Passed

Document Content and Description Below

EPA 608 Type 3 Questions and Answers Already Passed On low pressure chillers, moisture typically enters the refrigerant system through ✔✔air leaks from areas with gaskets or fittings The maxim ... um test pressure for leak testing a low pressure centrifugal is: ✔✔10 psig Leak test and repair the chiller to reduce refrigerant loss from a pruge unit on CFC-11 chiller ✔✔... A hydrostatic tube test kit is used to: ✔✔determine if a tube leaks Commercial and industrial process refrigeration systems must be repaired when the leak rate exceeds ____ of the charge per year. ✔✔35% Refrigerant recovery typically start with liquid recovery it is faster. ✔✔... A rupture disc on a recovery vessel for a low pressure refrigerants relieves at: ✔✔15 psig According to ASHRAE Guideline 3-1996, if the pressure in a system rises from 1 mm Hg to a level above ____ during a standing vacuum test, the system should be checked for leaks. ✔✔2.5 mm Hg The primary water source for a recovery unit condensing coil is _____. ✔✔local municipal water supply When recharging a refrigeration system with R-11, what vaporpressure is necessary in the shells before changing with liquid? ✔✔16.9" Hg vacuum After recovering the liquid refrigerant you must: ✔✔recover the vapor refrigerant According to the EPA there is approximately _____ refrigerant vapor left in an average 350 ton R-11 chiller at 0 psig pressure once all the R-11 liquid has been removed. ✔✔100 pounds Charging refrigerant liquid into a refrigeration system when it is under a 29 inch Hg vacuum can cause the: ✔✔system water to freeze A system does not have to be evacuated all the way to the required level when: ✔✔leaks in the appliance make evacuation to the prescribed level unattainable Which of the foloowing repairs would ALWAYS be considered "major" under EPA's ✔✔replacement of evaporator coil Under EPA's regulation's _______ is used to pressurize a low pressure chiller for the purpose of opening the system for a non major repair? ✔✔warming the refrigerant If you are using a recovery machine manufactored AFTER 11-15-93 you must evacuate an low pressure appliance to _______ before making a major repair. ✔✔25 mm of Hg absolute After reaching the required recovery vacuum on a chiller, you should ✔✔Wait for at least a few minutes to see if the system pressure rises, indicating that there is till refrigerant in a liquid form or in the oil The pressure corresponding to 32 F for R-123 ✔✔20 inches of HG vacuum When evacuating a system the use of too large a vacuum pump can cause? ✔✔trapped water to freeze Refrigerant-11 at a pressure of 17 inches HG vacuum has a saturation temperature of: ✔✔35F During the evacuation of a system containing large amounts of moisture you can prevent freezing of this moisture by increasing the pressure with______gas ✔✔nitrogen ASHRAE standard 15-1994 requires that each machinery room must activate an alarm and mechanical ventilation beofre refrigerant concentrations exceed: ✔✔the threshold limit valve and time weighted average The typical design burst pressure for a rupture disk on a low pressure centrifugal air-conditioning system is set at_______ ✔✔15 psi Heat pumps that have been retrofitted from R22 to R407C should be leak checked with: ✔✔pressurized nitrogen When a new system has been assembled, the first thing to do is: ✔✔pressurize the system with inert gas and leak check EPA regulations require that leaking commercial or industrial process refrigeration equipment must be repaired when the leak rate exceeds______ of the charge per year. ✔✔35% Prior to replacing the condenser coil in a high pressure system, the refrigerant was recovered and stored in a refillable container. The refrigerant: ✔✔can probably be charged back into the system R-410A requires recovery tanks rated for at least: ✔✔400 psig to recover liquid refrigerant you must connect one hose to the ✔✔liquid line The primary water source for cooling the con [Show More]

Last updated: 2 years ago

Preview 1 out of 18 pages

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)
Preview image of EPA 608 Type 3 Questions and Answers Already Passed document

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Also available in bundle (1)

Click Below to Access Bundle(s)

[SOLVED] EPA BUNDLED EXAMS QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS

[SOLVED] EPA BUNDLED EXAMS QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS

By Nutmegs 2 years ago

$20

17  

Reviews( 0 )

$10.00

Buy Now

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Instant download

Can't find what you want? Try our AI powered Search

128
0

Document information


Connected school, study & course


About the document


Uploaded On

Jan 02, 2023

Number of pages

18

Written in

All

Seller


Profile illustration for Nutmegs
Nutmegs

Member since 4 years

607 Documents Sold

Reviews Received
77
14
8
2
21
Additional information

This document has been written for:

Uploaded

Jan 02, 2023

Downloads

 0

Views

 128

Document Keyword Tags


$10.00
What is Scholarfriends

Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·