WELL AP WEEK 1 QUIZ
For which of the following building types are WELL Building Standard v1 NOT applicable?
Choose 2
New tenant space in an office building
New core and shell development
New single family residence
...
WELL AP WEEK 1 QUIZ
For which of the following building types are WELL Building Standard v1 NOT applicable?
Choose 2
New tenant space in an office building
New core and shell development
New single family residence
New hospital building - ✔✔New single family residence, new hospital building
How often should a WELL certified project under recertification verify continuous performance
in accordance with the WELL Building Standard? - ✔✔Every 3 years
According to a study completed by the World Green Building Council, it shows Staff costs such
as salaries and benefits account for ____ of most business operational expenses - ✔✔90%
The New and Existing Building typology is relevant for office buildings where a minimum of
___ of the total floor area is occupied by the building owner and is operated by the same
management. - ✔✔
Which of the following conditions must be met for a new building project team to schedule the
WELL Performance Verification? - ✔✔Documentation approved, one month from Certificate of
Occupancy, 50% occupancy achieved
What minimum score must an existing 2 story retail building earn in any concept to qualify for
WELL silver certification? - ✔✔5
What is the role of a WELL AP? - ✔✔Guide projects to a successful certification or compliance
award
Which of the following are characteristics of WELL features?
All features are required to be satisfied for WELL certification
Features can be only Prescriptive standards
Features can be only Performance-based standards
Features can be Performance-based standards or Prescriptive standards - ✔✔Features can be
Performance-based standards or Prescriptive standards
Which of the following are annotated documents that should be turned in for a WELL
certification application?
Lighting drawings and mechanical drawings
Furniture plans and equipment schedules
Lighting drawings and floor plans
Floor plans and lighting specifications - ✔✔Lighting drawings and mechanical drawings.
What percent of WELL Preconditions must be met in order to achieve Silver Certification for a
Pilot Project? - ✔✔100%
Which of the following is TRUE about the project administrator? Choose 3
a) The project administrator ensures completeness and accuracy of documents submitted
b) The project administrator can be a WELL Accredited Professional (WELL AP)
c) The project administrator is the primary point of contact on the project
d) The project administrator is responsible for review of all documentation and on-site testing
e) The project administrator MUST be a WELL Accredited Professional (WELL AP) - ✔✔a,b,c
Which of the following are duties of a WELL Assessor on a project registered for WELL
certification? - ✔✔Conduct performance verification
What percentage of project area must be controlled by the owner in order to register it under
Core & Shell Development for WELL Certification? - ✔✔
Which of the following is true about IWBI? Choose 2
a) IWBI was established by USGBC pursuant to a Clinton Global Initiative
b) 51% of net profits received from WELL Certification project fees will be directed by IWBI
toward charitable contributions focused on health, wellness, and the built environment
c) IWBI was established by Delos pursuant to a Clinton Global Initiative
d) 50% of net profits received from WELL Certification project fees will be directed by IWBI
toward charitable contributions focused on health, wellness, and the built environment - ✔✔
The WELL Building Standard was pioneered by which of the following organizations?
Delos
International WELL Building Institute (IWBI)
USGBC
Cleveland Clinic - ✔✔Delos
How long does a project have to submit their applications for the WELL Building Standard after
registering the project? - ✔✔5 years from the date of registration
IWBI was established pursuant to which of the following ?
USGBC Summit
Agenda 21
Greenbuild International
Montreal Protocol
Clinton Global Initiative - ✔✔
In order to achieve Platinum Certification for both the WELL Building Standard and WELL
Pilot Standards, ___ percent of applicable Optimizations must be achieved. - ✔✔80%
Who among the following can sign a Letter of Assurance for a WELL Feature? (Choose 3)
a) Architects
b) Engineers
c) Vendors
d) City Officials
e) Property Managers
f) Contractors - ✔✔a,b,f
Which of the following body system's primary function is to supply nutrients and remove waste
from the body tissues?
Cardiovascular System
Endocrine System
Integumentary System
Urinary System - ✔✔Cardiovascular system
At what point should the project team schedule the Performance Verification for a Core and
Shell Development? - ✔✔After the Documentation Review phase is marked approved in WELL
Online
Which of the following represent general types of verification for WELL Features? (Choose 3)
a) On-Site Checks
b) Annotated Documents
c) Curative Plans
d) Letters of Assurance
e) Alternative Adherence Paths - ✔✔a,b,d
Which of the following must be true for a school with a cafeteria project in order to earn WELL
Certification?
a) The project should use New Building Standard for the Primary. Secondary Space need not be
evaluated for WELL Certification
b) The project may choose depending on ownership
c) The project should use Educational Facilities pilot standard for primary space and the
Commercial Kitchen pilot standard for secondary space
d) The project should use WELL Building Standard for the Primary as well as Secondary Space -
✔✔c
What is the name of a series of publications containing reviews of the body of research that
supported the development of the underlying concepts and requirements of the WELL Building
Standard? - ✔✔
Which of the following is true about a project registered for LEED certification?
a) A LEED Registered Project should earn LEED certification before registering for WELL
Certification
b) A LEED Registered Project cannot pursue WELL Certification
c) The Project should have registered for WELL certification first
d) A LEED Registered Project may pursue WELL certification if it meets the requirements as
outlined in WELL building standard - ✔✔d
WELL Building Standard v.1 be applies to which of the following building types? Choose 2
a) Residential
b) Commercial
c) Neighborhood
d) Institutional
e) Industrial - ✔✔b,d
Which of the following combinations of Preconditions and Optimizations would result in a
Silver award for a project using WELL Building Standard?
a) All Preconditions only
b) All Preconditions and 20% of Optimizations
c) All Preconditions and 40% of Optimizations
d) 80% of Preconditions and 40% of Optimizations - ✔✔b
Which of the following combinations of applicable WELL Features would result in Core and
Shell Compliance?
a) 80% of Preconditions and 40% of Optimizations
b) All Preconditions and 10% of Optimizations
c) All Preconditions and one Optimization from each WELL Concept
d) All Preconditions and 20% of Optimizations - ✔✔c
What would a project team be required to provide to maintain its status as a WELL Certified
project? - ✔✔Logs with proof of maintenance and results of post occupancy surveys
What should a project team pursue to address unmet criteria within a WELL scorecard? -
✔✔Curative action
In order to achieve Silver Certification for the WELL Building Standard, what % of applicable
Optimizations must be achieved for a new construction project? - ✔✔
Which of the following is true regarding a Core and Shell building that is WELL Certified?
a) New and Existing Interiors certification is easier for this building for tenant spaces
b) The Project should recertify every 3 years
c) New and Existing Interiors certification is not possible
d) The Project should recertify every 5 years - ✔✔a
Which resource should be used to register a project for WELL certification? - ✔✔WELL online
How many days does a project team have to accept the WELL report? - ✔✔180
Which of the following is a requirement for projects pursuing WELL Certification?
Appoint a WELL Assessor for registration
Meet 40% of all pre conditions
Integrative design
Hire a WELL AP - ✔✔Integrative design
Which of the following body system is NOT addressed by the WELL Building Standard v1?
Integumentary system
Endocrine system
Digestive system
Lymphatic system
None of the above - ✔✔None of the above
BUT the lymphatic system is a part of the cardiovascular system despite not being mentioned
directly. It can be used as the answer if none of the above is not there as an option.
Which of the following individuals may NOT be the WELL AP serving as the WELL Project
Administrator?
Engineer
Contractor
Architect
Owner
WELL Assessor - ✔✔WELL assessor
[Show More]