Engineering  >  QUESTIONS & ANSWERS  >  Special inspector general requirement 2022 with complete solution (All)

Special inspector general requirement 2022 with complete solution

Document Content and Description Below

Special inspector general requirement 2022 with complete solution A special inspector shall demonstrate competence to the satisfaction of the _____________ -Answer- Building Official The special ... inspector observes critical building or structural elements identified in the statements of special inspections for compliance with __________ and __________ approved by the building official. -Answer- plans, specifications Who shall the special inspector notify of their presence on a jobsite? -Answer- Contractor Personnel All nonconforming items shall be brought to the immediate attention of the -Answer- Contractor What are approved plans? -Answer- Plans that have been approved by governing jurisdiction. Who can employ an approved inspection agency? -Answer- Owner or Owner's agent Special inspections are in addition to the ______________ performed by the city inspector and the _____________ performed by the structural engineer of record. -Answer- Jurisdictional/Municipal Inspections, Structural observation Special inspections review the _____________ while jurisdictional inspection reviews the ____________ -Answer- Fine details, Broad details When nonconforming items are not corrected the special inspector shall notify the _________ and _________ -Answer- Register Design Professional, Building Official The permit applicant shall submit a statement of special inspections prepared by the____________ -Answer- Registered design professional Who shall the special inspector furnish inspection reports (progress reports) to? -Answer- Building official, Registered design professional, and other designated people Who performs a structural observation? -Answer- Registered Design professional. _____________ is a full time observation of work requiring special inspection -Answer- continuous special inspection Is special inspection required for concrete placement of 3000 psi concrete in isolated spread footings for a single story warehouse? -Answer- No. (isolated spread footings) IBC 1705.3 Explain what periodic special inspection is -Answer- Special inspection by the special inspector who is intermittently present where the work to be inspected has been or is being performed. Is special inspection required for concrete placement of continuous footings, for poured in place walls, if the building is two stories in height and engineer included all footings in his statement of special inspection. -Answer- Yes (IBC 1705.3) If it takes 6 1/2 hours to pour 4 shear walls and 26 columns on the third level of a ten story building, how much time is the special inspector required to be on site? -Answer- As long as it takes. (IBC Table 1705.3) What other tests are required every time strength tests are cast? -Answer- Temperature, air content, and slump (IBC Table 1705.3 #6) Where does it specify the type and extent of special inspections required? -Answer- Statement of special instruction (IBC 1704.3.1) Structural observation is required for all buildings over ______ in height for buildings located in Seismic Design Category D. -Answer- 75ft (IBC 1704.2 exception 1) Who can waive the requirement of special inspection on work of a minor nature? -Answer- Building official The inspection of curing temperatures and techniques for concrete should be -Answer- Verified w/ periodic special inspection (IBC Table 1705.3) The type and extent of each special inspection shall be located in a.) Chapter 17 of building code b.) the statement of special inspection c.) the job specifications d.) the approved plans -Answer- b.) The statement of special inspection Who has the legal authority to enforce the special inspection provisions of the building code? a.) general contractor b.) inspection company c.) registered design professional d.) building official -Answer- d.) Building official [Show More]

Last updated: 3 years ago

Preview 1 out of 12 pages

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)
Preview image of Special inspector general requirement 2022 with complete solution document

Buy this document to get the full access instantly

Instant Download Access after purchase

Buy Now

Instant download

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Reviews( 0 )

$7.00

Buy Now

We Accept:

Payment methods accepted on Scholarfriends (We Accept)

Instant download

Can't find what you want? Try our AI powered Search

92
0

Document information


Connected school, study & course


About the document


Uploaded On

Sep 15, 2022

Number of pages

12

Written in

All

Seller


Profile illustration for Excel
Excel

Member since 3 years

246 Documents Sold

Reviews Received
15
2
2
1
6
Additional information

This document has been written for:

Uploaded

Sep 15, 2022

Downloads

 0

Views

 92

Document Keyword Tags


$7.00
What is Scholarfriends

Scholarfriends.com Online Platform by Browsegrades Inc. 651N South Broad St, Middletown DE. United States.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Scholarfriends · High quality services·